Project for cutting the Abu Simbel Temples into blocks to be dismantled and reassembled at a safer height, Abu Simbel, Upper Egypt (1964)

Item set

Description

Plan area of the site with the provisional dam for protection of the temples

Rights

For reuse requests please contact the right holders.

Citer ce document

InVisu (CNRS-INHA), "Project for cutting the Abu Simbel Temples into blocks to be dismantled and reassembled at a safer height, Abu Simbel, Upper Egypt (1964)", Expositions virtuelles du laboratoire InVisu, https://corpus-visuels-invisu.inist.fr/s/building-beyond-mediterranean/item/14304, accessed on November 21, 2024

Other Media

-