Kosheshah bridge, Fayoum, North of Beni Suef, Egypt (c. 1909)
Item set
Description
Assembly of the bridge’s archs was operated with the support of a wooden structure as shown on the picture. The bridge was assembled with the help of a local workforce under supervision of Baume & Marpent engineers, such as Engineer Rifflart who used to be the Egyptian Division’s Director
Sous collection
Commanditaire
Creator
Rights
See: https://collections.saicom.be/index.php/About/Modalites
Sous sous collection
Citer ce document
InVisu (CNRS-INHA),
"Kosheshah bridge, Fayoum, North of Beni Suef, Egypt (c. 1909)",
Expositions virtuelles du laboratoire InVisu,
https://corpus-visuels-invisu.inist.fr/s/building-beyond-mediterranean/item/13996,
accessed on November 21, 2024